Black Friday · Save up to $2,000 · 8–30 Nov · View offers

Tiny homes and cabins in Northland.

Sleepouts, self-contained cabins and granny flats, built in our Drury factory and delivered by truck and crane to Whangārei, Kerikeri, Kaitaia and the rest of Northland.

  • Sleepouts from$14,038 $13,738Save $300
  • Self-contained cabins from$27,396 $26,996Save $400
  • Granny flats from$81,366

Prices incl. GST, excl. delivery.

Sunrise Build cabin with a timber deck in a paddock
A Sunrise Build cabin on a rural property.
Ready from 4 weeks · typically 4–12 weeks from depositDelivery, foundations and connections quoted for your site

Built in Drury, delivered to Northland.

DruryOur factory, south Auckland
WhangāreiBy truck, lifted in by crane

Delivery from Drury to Whangārei: about 195 km by road.

Towns we deliver to
  • Whangārei
  • Kerikeri
  • Kaitaia
  • Dargaville
  • Kaikohe
  • Mangawhai
  • Bay of Islands
  • Hokianga

Choose what you need.

Three ranges, all delivered to Northland. Each one is built in our Drury factory and arrives with connection points ready for your local tradespeople.

  • Sleepout cabin with a glazed door in a garden
    SleepoutsAn extra bedroom, office or studio, in six sizes from 16 to 30m². See sleepouts
  • Self-contained cabin with a kitchenette and bathroom
    Self-contained cabinsA compact cabin with its own kitchenette and bathroom, for guests, workers or a studio. See self-contained cabins
  • One-bedroom granny flat exterior concept
    Granny flatsA one-bedroom home with a full kitchen and bathroom, built to live in. Concept image. See granny flats

Get a quote delivered to Northland.

Tell us what you need and where it will go. We will reply with a quote that includes delivery to your address.

Before you order.

Three things Northland buyers ask us about first.

How delivery works

  1. Quote with deliveryWe get a transport quote for your address and include it in your quote.
  2. Site checkYou tell us about access, and we check the truck and crane can reach the spot.
  3. Lifted into placeA crane sets the cabin on the foundations you have arranged.

Council rules

Your council sets the rules for your site. In Northland that is usually Whangārei District Council, Far North District Council and Kaipara District Council.

Eligible granny flats up to 70m² may be built without a building consent when all exemption conditions are met, including a Project Information Memorandum (PIM) before work starts. Check your property at canibuildit.govt.nz or read the MBIE guidance.

See one first

Our showroom in Drury is about 195 km from Whangārei, so you can see the cabins in person on your way through Auckland before you order.

Address
34 Creek Street, Drury 2113
Viewing
Mon to Fri, 9:00 to 17:00
Saturday
By appointment
Book a viewing

What our customers say.

From buyers across New Zealand. Read more reviews.

  • “Highly recommend. I have compared around a few suppliers. Sunrise offer the best quality with excellent price.”
    Karen9.91 × 3m cabin
  • “Thank you for a very good deal. The cabin’s specs were far superior than what we were expecting.”
    Steffen & Viola9.91 × 3m self-contained cabin
  • “This is the third cabin we bought from Sunrise Build. It’s lovely!”
    Eileen & Mary8.08 × 2.6m cabin

Questions from Northland buyers.

Do you deliver to Whangārei, Kerikeri and the Far North?

Yes. We deliver to Whangārei, Kerikeri, Kaitaia, Dargaville, Kaikohe, Mangawhai, the Bay of Islands and the Hokianga. Delivery is quoted for your address and included in your quote.

Can I see a cabin before I buy?

Yes. Our showroom is in Drury, Auckland, about 195 km from Whangārei. Viewing is Monday to Friday, 9:00 to 17:00, and Saturday by appointment.

Can a cabin go on a coastal or rural section?

Yes, as long as a truck and crane can reach the spot. Rules for coastal and rural land depend on your district plan, so check with your council or at canibuildit.govt.nz.

Do I need consent for a cabin in Northland?

It depends on the building and how you use it. Granny flats up to 70m² can be built without a building consent when all exemption conditions are met, including a Project Information Memorandum (PIM) from your council before work starts. For other cabins, check with your council before you order.

What do I arrange myself?

The foundations and the power, water and wastewater connections, through local contractors. We can recommend foundation partners.