Granny flat rules in NZ,
in plain English.
Since 15 January 2026, a granny flat up to 70m² can be built without building consent, if it meets every condition below.
Checked against MBIE’s granny flats exemption guidance (October 2026 version) on 14 November 2026.

The conditions, at a glance.
Miss one and the exemption doesn’t apply, so you’d need a building consent as usual.
- Up to 70m² of floor areaMeasured inside: between the finished inner faces of the outside walls.
Details
An attached or internal garage counts towards the 70m². - Single storey and standaloneNo mezzanine, and not joined to another building.
Details
Maximum height 4m above floor level. The floor can be no more than 1m above the ground. - 2m clear all roundAt least 2m from every legal boundary and from any other home on the site.
Details
Find your boundary pegs rather than relying on a fence line. - A simple, lightweight buildLight timber or steel frame, lightweight roof and cladding.
Details
A certified composite structural product can also be used for the frame. No level-entry shower that needs a waterproof membrane. Heating must be electric or gas; a wood burner needs building consent. - Licensed buildersRestricted building work must be done or supervised by Licensed Building Practitioners.
Details
The usual homeowner exemption doesn’t apply. Plumbing, drainlaying, electrical and gas work must be done by the relevant licensed trades. - A PIM before any work startsApply to your council for a project information memorandum first.
Details
The council must issue it within 10 working days of a complete application. The PIM lapses if the build isn’t finished within 2 years. - Tell the council when it’s finishedWithin 20 working days of completion.
Details
Send final plans, Records of Work, Certificates of Work, and electrical and gas certificates. - Development contributions may applySome councils charge a one-off contribution.
Details
If one applies, the council sends a notice and payment is due within 20 working days of completion.
From idea to move-in.
- Check your siteZoning, boundaries, access, and where water, power and wastewater will connect.
- Apply for a PIMSend your council the preliminary plans and a description of the work. Building can only start once it’s issued.
- Build with licensed professionalsOn site, or in a factory then delivered. Restricted building work is done or supervised by an LBP.
- Place and connectServices are connected by licensed plumbers, drainlayers and electricians.
- Notify the councilWithin 20 working days, with plans, Records of Work and certificates, and pay any development contribution.
Two things people miss.
Resource consent is a separate rule
The National Environmental Standard for Detached Minor Residential Units lets a granny flat go ahead without resource consent in residential, rural, mixed-use and Māori purpose zones, if its standards are met.
That includes farms. If a standard isn’t met, you may still need resource consent. Cabins for farms
Built off site? Check the PIM timing
For a granny flat made in a factory, MBIE says a PIM is only needed for the final location where it will be placed.
In April 2026 the Government announced changes so exempt granny flats can be built off site before the PIM is issued. Confirm the current timing with your council before work starts.
Where Sunrise granny flats fit.
- Two sizes, 24m² and 30m², well under the 70m² limit.
- Single storey, built in our factory in Drury, Auckland, and delivered across the North Island.
- PS1 and PS4 documentation for the agreed scope.
- Building work signed off by a Licensed Building Practitioner.

Questions we get asked.
Do I need building consent for a granny flat in NZ?
Not if it’s a new, single-storey, standalone home of up to 70m² that meets every exemption condition, is built or supervised by licensed professionals, and you get a PIM first and notify the council when it’s done. Otherwise, yes.
How is the 70m² measured?
Inside the walls: between the finished internal faces of the external walls. An attached or internal garage counts. Product sizes are often quoted from outside dimensions, so check the internal figure.
Do I still need a PIM?
Yes. You must apply for a project information memorandum before building work starts. The council has 10 working days to issue it once your application is complete.
Can I put a granny flat on a farm or rural section?
The resource consent standard covers rural zones, so often yes, if its standards are met. The building consent exemption conditions still apply.
What happens if my granny flat doesn’t meet a condition?
The exemption doesn’t apply, and you’ll need a building consent in the usual way. MBIE notes that unconsented work can affect insurance and resale.
This page is general information, not legal advice. Rules can change, so check the official guidance and talk to your council about your site.